Commercial & Industrial

At Tadros Engineering, we don’t just engineer buildings—we create environments for business success. We understand the balance between form and function, cost and quality, compliance and creativity.

What we offer:

  • Full civil and structural design packages
  • Site servicing and access planning
  • Integration with architectural and ESD objectives
  • Energy-efficient and sustainable design considerations
  • Project coordination with key stakeholders and consultants

 

We know that commercial projects represent more than infrastructure—they embody your brand and vision. We take that responsibility seriously.

See our work

Commercial & Industrial

Grid Construction
Under Construction
Civil, Hydraulics, Electrical
Grid Construction
Under Construction
Civil, Hydraulics, Electrical
Georgiou and Perron Group
Circa 2024
Civil

Tadros Engineering was engaged to deliver civil engineering design services for a new, state-of-the-art autoparts distribution centre for Toyota WA. Located within a major industrial precinct, the project brings together leading partners including Georgiou, APP, and Perron to deliver a facility that sets new benchmarks in functionality, efficiency, and sustainability. Our scope included the design...

Georgiou and Perron Group
Circa 2024
Civil
Trisquare
Stage 1 Completed 2024, Stage 2 under construction
Civil

This project involved two distinct manufacturing warehouses, one measuring approximately 8,000sqm and the other 15,000sqm. These warehouses are dedicated to the production of switch rooms, sheet metal, and switchboards, respectively. The project was executed in two separate phases. Stage 1 involved the construction of the Switch Room Manufacturing Warehouse, and Stage 2 involved the development...

Trisquare
Stage 1 Completed 2024, Stage 2 under construction
Civil
Qdc
Under Construction
Civil

This project involved the upgrade of the existing Coles Facility at Perth Airport, which included a new freezer building, offices, loading docks, carpark expansion, refurbishments to the existing facility, and a new truck washing facility. Civil engineering covered detailed design of earthworks, pavement, stormwater design, and flexible...

Qdc
Under Construction
Civil
Qdc
Circa 2023
Civil

Tadros Engineering was engaged to provide civil engineering services for the development of a new bulk storage facility adjacent to an existing facility at Qube’s operational site in Rockingham. The project required careful integration with the existing infrastructure while accommodating the specific operational requirements of a high-capacity storage environment. Our scope included the design of...

Qdc
Circa 2023
Civil
Shelford Constructions
December 2019
Civil

Tadros Engineering was engaged by Shelford Constructions to deliver civil engineering services for the development of Lot 21 within the Roe Highway Logistics Park — one of Perth’s key industrial freight hubs. Working within the context of a complex logistics precinct, our team provided practical and responsive design solutions tailored to the site’s specific operational...

Shelford Constructions
December 2019
Civil
Monadelphous
2025
Civil, Hydraulics, Structural, Design Management, electrical

This project involved the upgrade of the loading dock area at the existing BHP mining camp Kalgan’s Rest, which generally involved the design and instalment of 4 x 40 foot refrigerated containers and the relocation of a dome workshop with 2 x 20 foot containers. It required Civil, Hydraulic, Structural and Design Management services, which...

Monadelphous
2025
Civil, Hydraulics, Structural, Design Management, electrical
BE Projects
Circa 2025
Civil, Structural

This project involved the design of a new Transperth bus depot facility in an existing site of 2.59ha located in Henley Brook. This project was divided into 4 stages and generally comprised of an administration office complex, a workshop facility, a wash/fuel facility and ancillary structures. Tadros Engineering was responsible for the civil and structural...

BE Projects
Circa 2025
Civil, Structural
BE Projects
Circa 2025
Civil, Structural

This project involved the refurbishment and alteration of the Mandurah Bus Depot and its amenities on an existing site of 1.64ha. This project was divided into 5 stages, generally comprising of new pavement and hardstand, stormwater modifications/upgrades, workshop facility and depot office extensions and ancillary structures. Tadros Engineering was engaged to perform civil and structural...

BE Projects
Circa 2025
Civil, Structural
Nicheliving
Circa 2025
Civil, Hydraulics

Tadros Engineering was engaged to deliver civil, site hydraulics, and building service hydraulics for a 12-apartment residential development in Medina. Our team worked closely with a licensed plumber to ensure the design incorporated the latest industry practices, with a focus on functionality, compliance, and buildability. This collaborative approach ensured a seamless integration of services within...

Nicheliving
Circa 2025
Civil, Hydraulics
Nicheliving
Circa 2015
Civil, Hydraulics

We provided civil, site hydraulics and building service hydraulics for a 66 Apartment Development in Beckenham. With the clients brief in mind, we ensured the use of innovative designs and products to ensure minimal cost could be achieved. We worked closely with a licenced plumber to ensure all the latest practices were incorporated into the...

Nicheliving
Circa 2015
Civil, Hydraulics
Site Architecture Studios
In Design Phase
Civil, Hydraulics

This project involved the civil and hydraulic design of a Men’s Shed located in Baldivis.  The design approach was to produce a functional and engaging facility that would improve the experiences of those that engage with it, and that provides the necessary amenities and safe environment where men are able to work on meaningful project....

Site Architecture Studios
In Design Phase
Civil, Hydraulics
Logos and Vaughans
February 2019
Civil

Tadros Engineering was engaged by Vaughan Constructions to deliver comprehensive civil engineering services for the development of Lot 11 Talbot Road in Hazelmere—an industrial site presenting challenging soil conditions, including heavy clay and a naturally low-lying topography. Our scope included detailed earthworks and pavement design, tailored to suit the site’s geotechnical constraints and functional requirements....

Logos and Vaughans
February 2019
Civil
Shelford Constructions
December 2019
Civil

Tadros Engineering was engaged by Shelford Constructions to deliver civil engineering services for the development of Lot 21 within the Roe Highway Logistics Park—one of Perth’s key industrial freight hubs. Working within the context of a complex logistics precinct, our team provided practical and responsive design solutions tailored to the site’s specific operational and drainage...

Shelford Constructions
December 2019
Civil