This project involved two distinct manufacturing warehouses, one measuring approximately 8,000sqm and the other 15,000sqm. These warehouses are dedicated to the production of switch rooms, sheet metal, and switchboards, respectively. The project was executed in two separate phases. Stage 1 involved the construction of the Switch Room Manufacturing Warehouse, and Stage 2 involved the development of the Fabrication Warehouse. Our scope of works comprised the Civil design of the project, which generally involved stormwater design, site earthworks levels, pavement levels and flexible pavement design.