















This project involved the design of a new Transperth bus depot facility in an existing site of 2.59ha located in Henley Brook. This project was divided into 4 stages and generally comprised of an administration office complex, a workshop facility, a wash/fuel facility and ancillary structures. Tadros Engineering was responsible for the civil and structural scope, which generally included earthworks site levels, flexible pavement design, stormwater drainage design, footings and slab design for all of those buildings.