Client:
Monadelphous
Project Completion:
2025
Services:
Civil, Hydraulics, Structural, Design Management, electrical

This project involved the upgrade of the loading dock area at the existing BHP mining camp Kalgan’s Rest, which generally involved the design and instalment of 4 x 40 foot refrigerated containers and the relocation of a dome workshop with 2 x 20 foot containers. It required Civil, Hydraulic, Structural and Design Management services, which generally comprised designing the drainage infrastructure system, final grades and levels, concrete footings, steel frames and platform for sea container loading dock area, and sanitary plumbing and drainage connection of the cool room containers.

Recent Projects

Jandakot Airport
Under Construction
Civil, Electrical
Jandakot Airport
Under Construction
Civil, Electrical
Grid Construction
Under Construction
Civil, Hydraulics, Electrical
Grid Construction
Under Construction
Civil, Hydraulics, Electrical
Georgiou and Perron Group
Circa 2024
Civil

Tadros Engineering was engaged to deliver civil engineering design services for a new, state-of-the-art autoparts distribution centre for Toyota WA. Located within a major industrial precinct, the project brings together leading partners including Georgiou, APP, and Perron to deliver a facility that sets new benchmarks in functionality, efficiency, and sustainability. Our scope included the design...

Georgiou and Perron Group
Circa 2024
Civil
Bestry Holdings
Under Construction
Civil, Structural

At present, we are overseeing Stage 1 of a 127-lot subdivision project that we have designed. Our design responsibilities encompassed all earthworks, services (excluding electrical and communications, which we oversaw), and substantial retaining walls. We are also actively managing the project until its completion, ensuring a smooth transition to the title...

Bestry Holdings
Under Construction
Civil, Structural
Trisquare
Stage 1 Completed 2024, Stage 2 under construction
Civil

This project involved two distinct manufacturing warehouses, one measuring approximately 8,000sqm and the other 15,000sqm. These warehouses are dedicated to the production of switch rooms, sheet metal, and switchboards, respectively. The project was executed in two separate phases. Stage 1 involved the construction of the Switch Room Manufacturing Warehouse, and Stage 2 involved the development...

Trisquare
Stage 1 Completed 2024, Stage 2 under construction
Civil
Qdc
Under Construction
Civil

This project involved the upgrade of the existing Coles Facility at Perth Airport, which included a new freezer building, offices, loading docks, carpark expansion, refurbishments to the existing facility, and a new truck washing facility. Civil engineering covered detailed design of earthworks, pavement, stormwater design, and flexible...

Qdc
Under Construction
Civil