This project involved the upgrade of the loading dock area at the existing BHP mining camp Kalgan’s Rest, which generally involved the design and instalment of 4 x 40 foot refrigerated containers and the relocation of a dome workshop with 2 x 20 foot containers. It required Civil, Hydraulic, Structural and Design Management services, which generally comprised designing the drainage infrastructure system, final grades and levels, concrete footings, steel frames and platform for sea container loading dock area, and sanitary plumbing and drainage connection of the cool room containers.